Skip Headers
Oracle® Fusion Middleware Upgrade Guide for Oracle Data Integrator
11
g
Release 1 (11.1.1)
Part Number E12642-02
Home
Book List
Index
Master Index
Contact Us
Next
View PDF
Contents
Title and Copyright Information
Preface
Audience
Documentation Accessibility
Related Documents
Conventions
1
Oracle Data Integrator Upgrade Overview
1.1
Flowchart of the Oracle Data Integrator Upgrade Process
1.2
Steps in the Oracle Data Integrator Upgrade Process
2
Oracle Data Integrator 11
g
for 10
g
Users
2.1
Components of the Oracle Data Integrator Installation
2.2
Important Changes for Oracle Data Integrator 10g Users
2.2.1
Upgrade Considerations
2.2.2
Changes in the Run-Time Agent
2.2.3
Other Changes
3
Upgrading Your Oracle Data Integrator Environment
3.1
Task 1: Understand the Starting Points for Oracle Data Integrator
3.1.1
Starting Points When Upgrading the Middle Tier Instance
3.1.2
Starting Points When Upgrading the Oracle Data Integrator Repositories
3.2
Task 2: Plan the Oracle Data Integrator Component Architecture
3.3
Task 3: If Necessary, Upgrade the Database that Contains the ODI Repository
3.4
Task 4: Copy (Clone) Existing Master and Work Repositories
3.4.1
Schema Cloning Process for Oracle Database
3.4.2
Schema Cloning Process for Microsoft SQL Server Database
3.4.3
Schema Cloning Process for PostgreSQL Database
3.4.4
Schema Cloning Process for IBM DB2 Universal Database
3.4.4.1
Same Host Cloning Process for ODI 10g Master and Work Schemas
3.4.4.2
Different Host Cloning Process for ODI 10g Master and Work Schemas
3.4.5
Schema Cloning Process for IBM DB2 AS/400 Database
3.4.6
Schema Cloning Process for Sybase AS Enterprise 15+
3.4.7
Schema Cloning Process for Hypersonic SQL 1.7.3.3
3.5
Task 5: Create a Backup of the ODI Repositories to be Upgraded
3.6
Task 6: Install and Configure Oracle Data Integrator 11
g
3.7
Task 7: Run Upgrade Assistant to Upgrade ODI Middle Tier and Repositories
3.7.1
Task 7a: Run the Upgrade Assistant for Oracle Data Integrator
3.7.2
Task 7b: Upgrade the Middle Tier Instance
3.7.3
Task 7c: Upgrade the Oracle Data Integrator Repositories
3.8
Task 8: Perform Any Required Post-Upgrade Manual Steps
4
Oracle Data Integrator Post-Upgrade Tasks
4.1
Redistributing Centralized Repositories After Upgrade
4.2
Updating the Work Repository Connection Parameters
4.3
Updating Topology and Security Metadata
4.4
Re-applying ODI 10g Modifications to the ODI 11
g
Topology and Security Metadata
4.5
Re-applying Open Tools
4.6
Replacing KMs with Mandatory Updates
A
Oracle Data Integrator Upgrade Screens
A.1
Welcome
A.2
Specify Operation
A.3
Specify Source Home
A.4
Prerequisites
A.5
Target Database
A.6
Specify Work Repositories
A.7
Examine
A.8
Upgrade Summary
A.9
Upgrade Progress
A.10
End of Upgrade
Index
Scripting on this page enhances content navigation, but does not change the content in any way.