Skip Headers
Oracle® Enterprise Manager Ops Center Installation Guide for Linux Operating Systems
12c Release 1 (12.1.1.0.0)

Part Number E25139-03
Go to Documentation Home
Home
Go to Book List
Book List
Go to Table of Contents
Contents
Go to Feedback page
Contact Us

Go to previous page
Previous
Go to next page
Next
PDF · Mobi · ePub

1 About Installation

This documentation describes the procedures required to install and configure Oracle Enterprise Manager Ops Center.

The following topics are covered:

About Installation

The following is a typical sequences of tasks when installing Oracle Enterprise Manager Ops Center:

  1. Review the system requirements to determine what equipment you need.

  2. Prepare a set of systems for software installation, including installing operating systems and verifying that adequate system resources are available.

  3. Install and configure an Enterprise Controller. If you are using a High Availability configuration, install and configure at least two Enterprise Controller nodes.

  4. Install and configure at least one Proxy Controller. This can be the co-located Proxy Controller, which is installed with the Enterprise Controller.

The first two tasks are described in the Preparing Your Environment chapter. The final two tasks are described in the Installation and Configuration chapter.

Figure 1-1 Site Preparation, Installation and Configuration

Description of Figure 1-1 follows
Description of "Figure 1-1 Site Preparation, Installation and Configuration"

Enterprise Controllers and Proxy Controllers can be installed on Oracle Solaris 10, Oracle Solaris 11, Oracle Linux, or Red Hat Enterprise Linux. See the Oracle Enterprise Manager Ops Center Certified Systems Matrix for more information about supported OS versions.

See the Oracle Enterprise Manager Ops Center Security Guide for more information about security considerations.

Installing and Configuring Oracle Enterprise Manager Ops Center

Once systems are fully prepared, you can install and configure Oracle Enterprise Manager Ops Center. There are three components to an Oracle Enterprise Manager Ops Center installation:

  • An Enterprise Controller – The Enterprise Controller directs Oracle Enterprise Manager Ops Center actions and generates the user interface. If you are using high availability, you will install multiple Enterprise Controllers, but only one will be active at a time.

  • One or more Proxy Controllers – Proxy Controllers store Oracle Enterprise Manager Ops Center data and route jobs to managed systems.

  • Agent Controllers for managed systems – Agent Controllers communicate monitoring data, help run jobs, and enable software update support on managed systems. Agent Controllers can be installed when a system is discovered and managed.

There are four ways to install and configure Proxy Controllers:

  • Configure the co-located Proxy Controller that was automatically installed with the Enterprise Controller

  • Remotely deploy one or more Proxy Controllers as part of the Enterprise Controller configuration

  • Remotely deploy one or more Proxy Controllers using the Deploy Proxy Controller wizard

  • Manually install and configure one or more Proxy Controllers

Once the Enterprise Controller and Proxy Controllers are installed and configured, Oracle Enterprise Manager Ops Center is functional.